7CPC
estimated Pay Scales
Obviously it is simple thing, we can
say it a mathematical coincidence that we have in common in all previous pay
commission, but we cannot neglect this. Because it was there, every time it is
noticed that the revised pay was approximately three times higher than its pre
revised pay. Apart from all the factors which has been used to determine the
pay revision, we can use this simple formula ‘common multiplying factor’ to
know the 7th pay commission pay scale . If next pay commission prefer to
continue the same running pay band and grade pay system for seventh pay
commission also, the pay structure may be like the following projected figures
given below, using common multiplying factor ‘3’. The Following is only the
projected figure using common multiplying factor ‘3’
SIXTH
CPC PAY STRUCTURE
|
PROJECTED
PAY STRUCTURE FOR NEXT (VII) PAY COMMISSION
|
|||||
Name
of Pay Band/ Scale
|
Corresponding
Pay Bands
|
Corresponding
Grade Pay
|
Entry
Grade +band pay
|
Projected
entry level pay using uniform multiplying factor` 3’
|
||
Band
Pay
|
Grade Pay
|
Entry
Pay
|
||||
PB-1
|
5200-20200
|
1800
|
7000
|
15600-60600
|
5400
|
21000
|
PB-1
|
5200-20200
|
1900
|
7730
|
15600-60600
|
5700
|
23190
|
PB-1
|
5200-20200
|
2000
|
8460
|
15600-60600
|
6000
|
25380
|
PB-1
|
5200-20200
|
2400
|
9910
|
15600-60600
|
7200
|
29730
|
PB-1
|
5200-20200
|
2800
|
11360
|
15600-60600
|
8400
|
34080
|
PB-2
|
9300-34800
|
4200
|
13500
|
29900-104400
|
12600
|
40500
|
PB-2
|
9300-34800
|
4600
|
17140
|
29900-104400
|
13800
|
51420
|
PB-2
|
9300-34800
|
4800
|
18150
|
29900-104400
|
14400
|
54450
|
PB-3
|
15600-39100
|
5400
|
21000
|
29900-104400
|
16200
|
63000
|
PB-3
|
15600-39100
|
6600
|
25530
|
46800-117300
|
19800
|
76590
|
PB-3
|
15600-39100
|
7600
|
29500
|
46800-117300
|
22800
|
88500
|
PB-4
|
37400-67000
|
8700
|
46100
|
112200-20100
|
26100
|
138300
|
PB-4
|
37400-67000
|
8900
|
49100
|
112200-20100
|
26700
|
147300
|
PB-4
|
37400-67000
|
10000
|
53000
|
112200-20100
|
30000
|
159000
|
HAG
|
67000-
(ann increment @ 3%) -79000
|
Nil
|
201000
|
|||
HAG+
Scale
|
75500-
(ann increment @ 3%) -80000
|
Nil
|
226500
|
|||
Apex
Scale
|
80000
(Fixed)
|
Nil
|
240000
|
|||
Cab.
Sec.
|
90000
(Fixed)
|
Nil
|
270000
|
No comments:
Post a Comment